For applications requiring basic remote and/or multiple parallel startups, we supply MV and LV Electrical Synchronization and Paralleling Control Panels. These are used in cases of mains power failure and thus allow startup, control and synchronization of backup gen-sets.
Systems Available:
- Mains Parallel: used in handling multiple mains applications
- Standby Power: used for generator protection, engine support and standby applications
needing back synchronization - Prime Power: used for power management by implementing simple panels
MV and LV Control Panel Key Features:
- Customer or General Specifications
- Automatic or Manual Synchronization
- With or Without Load Testing
- Main Fail Test
- Load Sharing and Shedding
- VAR Sharing
- Smooth Load Transfer
- Redundancy and Data Archiving
- Advanced Communication Protocols Support
- Remote Control and Monitoring
- Duty and Standby Switching
- Load Demand Start and Stop
- Complying Protections